fbpx

Buildshure

We guarantee the price we quote will never increase! | Financing Available Learn More!
Get My ADU Site Study Today

Build Faster, Safer,
& Stronger Every Time

At BuildShure, we don’t just build ADUs and tiny homes-we redefine how you experience living.

Fill-in the form below and get your FREE ADU STUDY.

Fill-in the form below and get your FREE ADU STUDY.

Explore the Retreat POD Series

Every inch of our Retreat Pods are
thoughtfully utilized for comfort and functionality.
Work-Pod-v3

Work Pod

The Work POD is your ideal backyard workspace, with large windows for natural light and sound-dampening panels for focus. It’s a comfortable, affordable solution for a productive home office.
studio-gallery-image

THE STUDIO

The Studio is a versatile, stylish space with energy-efficient windows, air conditioning, a full kitchen, restroom, and an optional Murphy bed. It’s perfect for a home office, art studio, or peaceful retreat, offering all the comforts of a larger living space.
casita-gallery-image1a

THE CASITA

The Casita is a 1-bed, 1-bath energy-efficient unit with a full kitchen, modern interiors, and durable exterior finishes. It’s perfect as a guest house, retreat, or primary residence.
residence-gallery-image1

THE RESIDENCE

The Residence is a 2-bedroom, 1-bath modern space built with high-quality materials. Ideal as a guest retreat, primary home or rental income generator, it offers a flexible layout that maximizes space and comfort.

How Your ADU Comes to Life

01

Feasibility Study & Pricing

We assess your ADU project's viability, considering zoning rules, property size, and utility needs. Based on this information, we can provide a complete estimate of the project costs, allowing you to make a confident, well-informed decision.

02

Contract Signing & Design

After finalizing the pricing and signing the contract with our 3rd party approved general contractor, we create detailed plans and a 3D model for your review, ensuring everything aligns with your vision.

03

Permit Submission

As your dedicated project managers for the entire course of construction, we handle the entire permit process, ensuring compliance with local regulations for a smooth approval and timely start of construction.

04

ADU Kit Preparation & Delivery

While permits are being processed, we prepare your custom ADU kit and schedule delivery, ensuring construction can start as soon as the permits are approved.

05

Construction

Rest easy knowing your project is in expert hands. Our licensed contractor, along with your dedicated project management team, will oversee every detail, keeping you informed throughout the process. We'll ensure everything stays on schedule and meets the highest quality standards, so you can enjoy a stress-free experience.

06

Final Walkthrough & Handover

We conduct a final walkthrough, make any necessary adjustments, and hand over the keys once you're fully satisfied with your new ADU.

The Buildshure difference,
Our guarantee

We guarantee that your project will be completed in the specified time or we pay you $500 for every day the projects go over schedule.
We guarantee the price we quote will never increase!

Everything You Need to Know

Fire resistant
Mold Mildew Resistant
Termite Resistant
High R-Value Insulation
Structural Rating
Low sound Transmission
Buildshure SIP Panels Built to Last
(Click the Gold Dots above to learn more product details)

ADU FAQs

Homeowners in California who have a single-family residence or a lot zoned for residential use may be eligible to build an Accessory Dwelling Unit (ADU) under AB 976 and SB9. Local ordinances and zoning regulations will dictate specific requirements, but state law encourages the construction of ADUs to help address housing needs.
In some cases, yes. The need to upgrade your main electrical panel depends on the current capacity of your system and the energy requirements of your ADU. During the design phase, we’ll assess your electrical system and determine whether an upgrade is necessary.
It depends on the condition and capacity of your existing sewer line. We’ll inspect your system to determine if it can handle the additional load from an ADU. If not, an upgrade may be required to ensure everything runs smoothly.
In most cases, the existing water line is sufficient. However, if your water pressure or supply is insufficient for both your main home and the ADU, an upgrade may be recommended to ensure consistent water flow.
If gas is not available, there are alternative options such as electric appliances and electric water heaters. Many ADUs are designed to function entirely on electricity, allowing for energy-efficient, modern living without the need for gas.
Yes, we require a $1,000 deposit with a signed commitment to secure your ADU order and start the process. Nothing else is due until we submit permit drawings to the local city/county and your ADU kit ships to your project site.
The construction timeline can vary depending on factors like design complexity, permitting, and site conditions. However, on average, it takes between 2-4 months complete an ADU project from start to finish, including design, permitting, and construction. The good news is that we only need 30-60 days from receiving permit approval to finish your ADU! We aim to make the process as efficient as possible!
Throughout the construction process, you will have a dedicated project manager assigned as your primary point of contact. They will keep you informed about the progress, address any questions or concerns, and ensure the project stays on track from start to finish.
An approved BuildShure contractor has been carefully vetted and meets our high standards for quality, craftsmanship, and reliability. These contractors are trained on installing our proprietary panelized systems and adhere to our strict guidelines to ensure the successful construction of your ADU. Working with an approved contractor guarantees that your ADU will be built to the highest standards, with attention to detail and efficiency. The best part is your quoted price will never go up!
We offer two guarantees: Price Guarantee: The price we quote will never increase—not by a single penny. The only exceptions are unforeseen circumstances such as unknown utilities discovered during excavation or environmental or biological hazards found in or beneath the soil that were not previously known.

Timeframe Guarantee: If we do not complete the project within the specified timeframe, we will pay you $500 for every day we go beyond the agreed-upon schedule. This ensures we stay committed to timely project delivery.
Our team brings together the best of both worlds. We have in-house full architectural and engineering design experts, combined with years of hands-on construction experience. This integrated approach ensures that every aspect of your project is handled by professionals who understand both the technical design details and the practical challenges of construction. You benefit from this comprehensive expertise at no additional cost, ensuring a seamless and efficient process from start to finish.

Our SIP panels come in a variety of configurations depending on the specific project needs. The two most common types are:

1. Fire-resistant wood sheathing with a high R-value rigid foam core.
2. Magnesium oxide board (MgO) with a high R-value rigid foam core.

Both types offer exceptional benefits, including fire resistance, mold and mildew resistance, termite resistance, and high structural strength to support heavy loads. They also have excellent sound-dampening properties, ensuring a quiet interior space, and their high R-value ratings contribute to lower energy costs by providing superior insulation.

Yes, they can. All of our SIP panels come with a complete structural calculation package and evaluation report for each individual assembly component. This ensures that our panels meet the strict standards required for high seismic zones, giving you peace of mind that your structure is built with the highest quality, safety-tested materials.
Each of our ADU kits includes all the components needed to build the ADU from the ground up. This ensures that installation is seamless and eliminates the hassle of making multiple trips to material supply houses for missing parts. Everything you need is included, saving you both time and money during construction. The best part is shipping to your site is free!

Get Your Free Retreat Pod Series Booklet!

Join our newsletter for ADU tips and updates, and receive instant access to the Retreat Pod Series booklet.

Scroll to Top